Cetus Central

Understand the network.
Bring clarity to the
control room.

From the geographic overview to a single feeder, keep equipment, measurements and operating history connected. Give operations, engineering and planning a clearer basis for working together.

Actual Cetus application view · Illustrative network data

Start with the whole electrical network

Follow the network
behind each reading.

A measurement belongs to equipment. Equipment belongs to a bay, a feeder and a wider network. Cetus Grid Twin keeps those relationships available as teams move between geography, single-line drawings, topology and recorded state.

From overview to apparatus

Follow the connection.
Keep its meaning.

Inspect buses, breakers, instrument transformers, protection devices, station gateways and their primary and secondary relationships. Open the equipment properties without losing the station context.

State and measurements carry timestamps, quality and source information. A configured model and an observed field condition remain distinguishable.

Explore the network representations
Actual Cetus application view · Illustrative network data

Built around your responsibility

Your infrastructure.
Your operational perspective.

Tell Cetus what you own, what you operate and what your team needs to achieve. Configure the services around your agreed boundary.

DSOs

Understand the distribution network.

Connect feeder and transformer observations with power quality, metering, outage investigations and field work. Follow evidence from a service connection to the agreed transmission handover.

Grid View and Grid Builder provide the common network context. Choose the distribution applications your team needs.

TSOs

Coordinate beyond the station boundary.

Bring your transmission model together with approved evidence from distribution and generation partners. C-GCC records coordination interfaces, checks evidence quality and shows where capacity assessments are ready or withheld.

Complement existing control-room systems with a shared understanding of constraints. Validated capacity calculations and operational exchanges require commissioning.

Generation companies and IPPs

Put plant availability into network context.

Model generation units, plant collectors, step-up transformers and the agreed grid connection. C-GCC provides a workspace for availability, connection constraints and coordination with the receiving network.

An independent power producer is one kind of generation company. Your asset register and operating agreements define the scope.

Independent systems. Agreed exchange.

Share the evidence.
Keep your own system.

Each operator has its own Cetus Central installation, database, Grid Twin (CGT) and intelligence engine (CGI). A transmission or generation installation has no direct access to a distribution operator's application, database or engine.

Where operators agree to collaborate, a commissioned protocol connection carries only the approved records between their systems. The receiving operator stores and assesses those records in its own environment, retaining their source, time and quality.

The connection does not grant database access or control of another operator's equipment. Protocols, authentication, shared data and operating responsibilities are agreed for each interface.

Discuss your operating model

A connected application portfolio

Bring specialist work
into the same picture.

Choose the licensed capabilities your organisation needs. Availability and commissioning scope are defined for each installation.

Understand

See the network and its evidence.

Grid Twin, power quality, metering and network insight connect observations to the assets and circuits behind them.

Operate

Coordinate investigation and response.

Fault and outage work, operational evidence and field activity stay connected to the same network context.

Plan

Prepare for changing demands.

Engineering, scenario analysis, asset needs and network investment can be assessed with their assumptions in view.

Protect

Keep access and assets in context.

Roles, maintenance, collection status and controlled access support responsible platform operation.

Browse the application guide

Explore the capability guide for the current development status and the scope to agree for an operational installation.

Connected to Cetus Edge

Better context begins
at the equipment.

Edge acquires data, maintains local twins, runs configured analytics and retains records near the source. Central maintains the network view from received evidence—whether from an engineered simulation or an integrated field installation.

Discover Cetus Edge Cetus and modern SCADA

Your organisation and your network

An installation
of your own.

Dedicated application instances and databases keep organisations separate. Access is approved for the installation, with role-based authority and licensed functions. Reporting and diagnostic sharing follow the agreed policy.

Your installation and its updates follow an agreed service process. A new release does not automatically change every customer installation.

Understand deployment and access

What should your control room
make possible?

Talk to Auri Energy

You can browse and send requests without accepting optional storage. Choices apply separately to each website and are remembered for up to 180 days.

Read the Cookie Policy

Application view

Actual Cetus application view with example network data.

Your Cetus workspace

Welcome back.

Use the installation link supplied by your organisation’s administrator. Access is approved for your organisation and its own network.

Need an installation or can’t find your link? Contact Auri Energy.